Regression modelling of risk impacts on construction cost flow forecast

Biomedical Sciences Research Institute Computer Science Research Institute Environmental Sciences Research Institute Nanotechnology & Advanced Materials Research Institute

Odeyinka, Henry, Lowe, John and Kaka, Ammar (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17 (3). pp. 203-221. [Journal article]

[img]PDF - Published Version
128Kb

URL: http://www.emeraldinsight.com/journals.htm?articleid=17062917&ini=aob&

DOI: 10.1108/13664381211274335

Abstract

Purpose – Significant risk factors inherent in construction cost flow forecast were identified in this study. The aim of this paper is to develop regression models to assess the impacts of the identified risks on the baseline forecast at the in-progress stage of construction.Design/methodology/approach – Two stages were involved in data collection. The first was astructured questionnaire survey administered on 370 UK contractors to identify significant riskfactors inherent in cost flow forecast. The second stage was the collection of forecast and actual cost flow data from 55 case study projects. Variations between these pair of data sets were measured at 30 per cent, 50 per cent, 70 per cent and 100 per cent completion periods. Respondents were then requested to score on a Likert type scale, the extent of occurrence of the significant risk factors in the case study projects. This pair of data sets were used in regression modelling.Findings – Significant risk factors were identified from the questionnaire survey analysis as:changes to initial design, variation to works, production target slippage, delay in agreeingvariation/dayworks and delay in settling claims among others. Using the identified significant risk factors and the periodic variability measurements, multiple linear regression models were developed. The models were promising in that they helped to establish the fact that the phenomenon under consideration could be modelled. They also provided some insights in explaining the observed variability between the baseline cost flow forecast and actual cost flow based on risk impacts.Research limitations/implications – The developed models showed a promising level of accuracy but also indicated that the phenomenon under consideration is not strictly linear and may need to explore some other form of modelling.Practical implications – The developed models provide invaluable information to the constructioncontractors regarding the likely impacts of significant risk variables on cost flow baseline forecast at different stages of construction so that a pro active risk response can be put in place.Originality/value – This study makes an original contribution of providing a modelling insight intothe phenomenon of how risks inherent in construction could impact the baseline cost flow forecast at different stages of construction. The information is invaluable in making pro active risk response.Keywords: Construction projects, Cost flow, Contractors, Regression modelling, Risk factors,United Kingdom, Risk management, Construction industry, Costs

Item Type:Journal article
Keywords:Construction projects, Cost flow, Contractors, Regression modelling, Risk factors, United Kingdom, Risk management, Construction industry, Costs
Faculties and Schools:Faculty of Art, Design and the Built Environment
Faculty of Art, Design and the Built Environment > School of the Built Environment
Research Institutes and Groups:Built Environment Research Institute
Built Environment Research Institute > Centre for Sustainable Technologies (CST)
ID Code:23924
Deposited By:Dr Henry Odeyinka
Deposited On:05 Nov 2012 14:40
Last Modified:05 Nov 2012 14:40

Repository Staff Only: item control page